MosraEnergyLimited'slimestoneexplorationprograminEdoStatespansAkoko-EdoandOwanEastregions,wherepilotdrillingandgeologicalsurveyshaveidentifiedpromisingmineralizationzones.Analysisshowhighcalciumoxidecontentandconsistentdepositthickness,positioningtheareaasaviablesourceforcementproduction.

The company’s presence is in two states (Edo and Benue Sate) of Nigeria where exploration activity is being planned for Limestone projects. The Edo site is located in Akoko-Edo and Owan East Local Government Area of the State while Benue site is located in Gboko Local Government Area in the State.

Thedepositoccursatabout2.00mbeneaththesurface
48.57–52.62%CaO,0.09-0.24%Fe2O3,0.62–6.34%MgO,1.10-2.75%SiO,41.69-42.90%LOIwithaveragerelativedensityof2.74
Depositestimatedthicknessisabout15.00m.15Pilotexploratoryboreholesproposedwithinthesuspectedpotentialarea

Connect with our Investor Relations team to learn more about current opportunities and project performance.
